The LNG Terminal moves about 90% of the natural gas consumed in Portugal, since it constitutes an alternative to the land pipeline.
The installation has three storage tanks for liquefied natural gas, with a storage capacity of 390.000 m³.
Has a nominal emission capacity of 900.000 m³(n)/hour, a maximum capacity of 1.350.000 m³(n)/hour and it can load up to 6.500 tanker trucks a year.
For ships with a capacity from 40.000 to 216.000 m³ GNL with an unloading time of about 20 hours.